2023 April |
1751 - Rro |
Norman |
0 |
Tarp |
|
|
04/16/2024 |
2022 Spring |
1716 - Aga |
Okmulgee |
2 |
Spray Shockwave anywhere and everywhere moisture or mold is detected. Install new boots around pipe vents need to be installed properly. Kitchen and Bathroom ceilings and above windows need to have new Drywall installed and Paint Ceilings and walls that were repaired. |
4 |
3 |
04/16/2024 |
2022 Spring |
1714 - Sbo |
Tulsa |
3 |
Spray Shockwave anywhere mold or moisture is detected. Replace Laminate flooring with Vinyl Plank flooring in Kitchen, and Living Room area. Replace Vinyl Siding on Westside of Home. Reframe Southside of Backdoor. |
7 |
7 |
04/16/2024 |
2023 June |
1710 - Cje |
Sand Springs |
1 |
Spray Shockwave anywhere mold or moisture is detected. Clean off Metal Roof and apply Elastomer to roof. Seal and coat around all Pipe Jacks and repair any and all cracks in Metal. She has a good Backdoor that someone gave her. Her Backdoor needs to be replaced. |
2 |
1 |
02/15/2024 |
2023 June |
1709 - Jia |
Glenpool |
1 |
Spray Shockwave anywhere mold or moisture is present. Tear off Roof and Replace complete roof. Foyer, Living Room, N. Center Bedroom Ceilings need Drywall repair, kilz stains, and repaint ceilings. |
7 |
7 |
02/05/2024 |
2022 Spring |
1706 - Gbe |
Haskell |
0 |
WO - Tarp |
|
|
04/16/2024 |
2023 April |
1694 - Whi |
Blanchard |
0 |
WO - Tarp/Debris |
|
|
01/11/2024 |
2023 June |
1662 - Jfi |
Sand Springs |
3 |
Repair Ceiling Damages in Bedroom and Living Room, 6- Sheets of Drywall to be replaced in both rooms and Mud, tape, texture and Paint both rooms. |
7 |
4 |
02/15/2024 |
2022 Spring |
1632 - Abo |
Muskogee |
3 |
Repair Drywall on Bedroom ceiling and walls, Repair Drywall in Bathroom. Install Vinyl Plank Flooring and trim in Bed and Bath. Vanity, Toilet, Shower in Bathroom, Closet Door in Bedroom, Window Casing in Bedroom. |
7 |
7 |
04/17/2024 |
2023 April |
1628 - Jcr |
Noble |
0 |
WO - Debris |
|
|
01/11/2024 |
2023 April |
1618 - Lfo |
Tecumseh |
2 |
Spray Shockwave on all mold. Prep metal roof and fill any holes, coat with elastomeric roof coating. Interior ceilings in the six rooms removal of damaged material including insulation then replaced with sheetrock. Paint, texture and finish ceiling. |
8 |
7 |
04/17/2024 |
2023 April |
1617 - Jpr |
Shawnee |
0 |
WO - Tarp |
|
|
10/13/2023 |
2022 Spring |
1616 - Ras |
Okmulgee |
1 |
Complete roof replacement. Bathrooms need drywall repair. Front Deck needs braced and steps and railings installed. Kitchen, Dining, Foyer, Bathroom need subflooring and finished installed. Some soffit and facia repair. Trim limbs away from roof. Backdoor needs replaced. Repair 6-ft Sliding Glass door framework. Master bathroom needs 30-in Vanity and Surround for bathtub. |
7 |
7 |
01/18/2024 |
2022 Spring |
1615 - Ahu |
Okmulgee |
3 |
Spray Shockwave anywhere mold or moisture is detected. Living Room & Dining room Ceiling need Drywall Repair, Kilz stain and Paint Ceilings in both rooms. Repair Subfloor and install Laminate flooring and Vinyl Plank flooring. |
7 |
7 |
01/16/2024 |
2022 Spring |
1614 - Hsm |
Westville |
3 |
Spray Shockwave anywhere mold or moisture is detected. Insatll Vinyl Plank flooring throughout the home. Install new Siding that matches the New Siding they installed on the Southside of the home. Trim with 1 x 4 cedar. |
5 |
4 |
03/20/2024 |
2023 April |
1607 - Rra |
Shawnee |
0 |
WO - Tarp |
|
|
10/03/2023 |
2023 April |
1598 - Sdu |
Shawnee |
0 |
WO - Debris & Chainsaw |
|
|
04/16/2024 |
2023 June |
1592 - Cwa |
Sand Springs |
0 |
WO - Tarp |
|
|
09/07/2023 |
2023 April |
15849 - Apa |
Shawnee |
0 |
WO - Tarp |
|
|
01/02/2024 |
2023 June |
15793 - Bmo |
Sand Springs |
0 |
WO - Tarp |
|
|
01/02/2024 |
2023 June |
1579 - Aro |
Tulsa |
0 |
WO - Tarp |
|
|
09/06/2023 |
2023 June |
1576 - Jgl |
Tulsa |
1 |
Remove and replace roof. Ceiling repair and paint. Facia Repair |
7 |
7 |
03/13/2024 |
2023 June |
1574 - Jda |
Tulsa |
0 |
WO - Tarp |
|
|
09/06/2023 |
2023 April |
1573 - Gwa |
Blanchard |
0 |
WO - Tarp |
|
|
10/26/2023 |
2023 June |
15707 - Rma |
Tulsa |
0 |
WO - Tarp |
|
|
01/11/2024 |
2023 June |
15696 - Jfi |
Sand Springs |
0 |
WO - Tarp |
|
|
01/11/2024 |
2023 April |
1567 - Khi |
Shawnee |
4 |
Remove damaged plaster in the kitchen, hallway and pantry from the ceiling and install new sheetrock, tape, bed and texture and then painted. Remove and replace exterior front door. |
5 |
5 |
03/28/2024 |
2023 April |
1561 - Sda |
Shawnee |
0 |
WO - Tarp |
|
|
01/11/2024 |
2023 April |
15548 - Jst |
Blanchard |
0 |
WO - Debris |
|
|
10/30/2023 |
2022 Spring |
15543 - Bsa |
Stilwell |
0 |
WO - Tarp |
|
|
12/29/2023 |
2023 June |
15487 - Cla |
Broken Arrow |
0 |
WO - Tarp |
|
|
09/19/2023 |
2023 April |
1529 - Ntu |
Shawnee |
3 |
Seal any loose shingles. Prime any water spots and paint all ceilings. Skim coat stress cracks near corners of the windows and paint to match existing wall color. Caulk areas where the crown molding has separated near the ceilings. Client has gift cards to use for materials. |
2 |
1 |
11/10/2023 |
2023 June |
1524 - Jsm |
Tulsa |
0 |
WO - Tarp |
|
|
09/06/2023 |
2022 Spring |
1516 - Jda |
Tahlequah |
1 |
Spray Shockwave anywhere mold or moisture is detected when tearing off layers of roof. Roof needs complete tear off and replacement, need to check decking and rafters for replacement. Bathroom wall has water-leak stains, needs Kilz Primer and Paint. |
7 |
3 |
03/14/2024 |
2023 April |
1515 - Mmu |
Shawnee |
0 |
Chainsaw work and debris removal |
|
|
04/18/2024 |
2023 April |
1514 - Mmc |
Shawnee |
0 |
WO - Tarp |
|
|
10/03/2023 |
2022 Spring |
1513 - Cmc |
Tulsa |
1 |
Spray Shockwave anywhere mold or moisture is detected. Replace Rafters, decking that are bad and replace roof. Ceiling drywall needs to be replaced, textured and painted. |
5 |
4 |
11/10/2023 |
2022 Spring |
14888 - Tbr |
Muskogee |
0 |
WO - Tarp |
|
|
03/01/2023 |
2022 Spring |
14862 - Cbr |
Muskogee |
3 |
Pipe Jack needs to be replaced and needs 1 sheet of drywall to replace damaged area in Utility Room and mud, tape and paint Utility Room Ceiling. After tear-out of drywall, spray any areas with Shockwave. |
4 |
3 |
02/21/2023 |
2022 Spring |
14845 - Sth |
Okmulgee |
0 |
WO - Tarp & Muck Out |
|
|
02/16/2023 |
2022 Spring |
14839 - Lco |
Ft Gibson |
0 |
WO - Tarp & Muck Out |
|
|
02/13/2023 |
2022 Spring |
14826 - Jhu |
Muskogee |
0 |
WO - Muck Out |
|
|
02/13/2023 |
2022 Spring |
14798 - Lad |
Okmulgee |
0 |
WO - Tarp |
|
|
01/20/2023 |
2022 Spring |
14791 - Spa |
Muskogee |
0 |
WO - Muck-out |
|
|
01/26/2023 |
2022 Spring |
1476 - Bra |
Okmulgee |
3 |
Spray Shockwave anywhere mold or moisture is detected. Tear out existing Patio Door and Replace, replace any studs that are damaged. |
2 |
1 |
11/10/2023 |
2022 Spring |
1475 - Bma |
Tulsa |
0 |
WO - Tarp |
|
|
08/17/2023 |
2022 Spring |
146987 - Jfi |
Okmulgee |
0 |
WO - Tarp / Debris |
|
|
02/23/2023 |
2022 Spring |
14626 - Bee |
Seminole |
0 |
WO - Tarp |
|
|
11/18/2022 |
2022 Spring |
1455 - Sth |
Okmulgee |
0 |
WO - Tarp |
|
|
07/06/2023 |
2022 Spring |
1454 - Lsa |
Okmulgee |
1 |
Remove and Replace Roof and 50% of decking that is bad. Replace top 2 pieces of Siding on the Peak of Westside of home. |
7 |
2 |
09/15/2023 |
2022 Spring |
1452 - Wmu |
Okmulgee |
0 |
WO - Tarp |
|
|
07/06/2023 |
2023 April |
1430 - Tev |
Shawnee |
2 |
Remove and replace shingles, felt, drip edge. Ice water barrier will need to be installed in the valleys and any plumbing vents replaced. |
10 |
5 |
11/09/2023 |
2023 April |
1353 - Dal |
Shawnee |
0 |
WO - Tarp |
|
|
01/11/2024 |
2023 April |
1331 - LSw |
Goldsby |
1 |
Remove and replace the shingles and remove and replace all decking. |
8 |
20 |
03/13/2024 |
2022 Spring |
1255 - Cth |
Okmulgee |
3 |
Spray Shockwave anywhere mold or moisture is detected. Ceilings need to be repaired and replaced in Kitchen, SW corner Bedroom, and Washroom Area. Repair any rafters, drywall, mud, texture and Paint Ceilings. Kitchen, SW Bedroom & Washroom, repair & Replace Subfloor, install laminate Flooring in SW Bedroom, Vinyl Plank Flooring in Wet Areas such as Kitchen and Washroom. Replace 50-ft of Facia Board. Kitchen Base Cabinets to be replaced. |
7 |
7 |
03/14/2024 |
2023 April |
1239 - Phi |
Noble |
0 |
WO - Debris |
|
|
10/26/2023 |
2023 April |
1239 - Phi |
Noble |
3 |
Building stairs to the front of the house. Client is funding this project and has materials on site. |
7 |
7 |
01/24/2024 |
2023 April |
1237 - Cle |
Norman |
0 |
WO - Tarp |
|
|
09/20/2023 |
2023 April |
1235 - Dro |
Noble |
0 |
WO - Tarp |
|
|
01/11/2024 |
2022 Spring |
1217 - Dla |
Seminole |
1 |
Remove and replaced the whole roof and any damaged decking. Numerous tree limbs will need to be cut back from the roof prior to beginning the roof work. |
8 |
5 |
02/05/2024 |
2022 Spring |
1201 - Nbe |
Okmulgee |
2 |
Kitchen Area needs Subfloor Repair and Replacement and Finish Flooring. Bathroom needs Finish Flooring. |
4 |
1 |
08/14/2023 |
2022 Spring |
1192 - Tca |
Seminole |
0 |
WO - Tarp |
|
|
05/15/2023 |
2022 Spring |
1188 - Abi |
Stilwell |
0 |
WO - Tarp |
|
|
05/17/2023 |
2022 Spring |
1158 - Abe |
Muskogee |
0 |
WO - Tarp |
|
|
03/21/2023 |
2022 Spring |
1157 - Jbr |
Okmulgee |
0 |
WO - Tarp |
|
|
03/21/2023 |
2022 Spring |
1153 - Dhe |
Haskell |
1 |
Install Insulation on exterior walls, drywall all walls, mud, tape, texture, paint. Install Laminate Flooring, underlayment. base trim in all rooms except for kitchen, bathrooms, laundry room, utility room, install Vinyl plank in all wet area rooms. Install Kitchen Base Cabinets, Vanities in both bathrooms, and all interior doors. |
10 |
7 |
09/18/2023 |
2022 Spring |
1115 - Jmc |
Haskell |
3 |
Replace Insulation, Drywall, tape, texture and paint all Interior Walls. Install Kitchen Cabinets, Countertops, Bathroom Vanities. |
7 |
7 |
01/16/2024 |
2022 Spring |
1092 - Fva |
Muskogee |
0 |
WO - Tarp |
|
|
04/27/2023 |
2022 Spring |
1071 - Lri |
Muskogee |
0 |
WO - Muck-out |
|
|
05/15/2023 |
2022 Spring |
1070 - Msi |
Oktaha |
3 |
Spray Shockwave as needed. Paint Baseboard Trim. Build front deck 15' x 10'. Replace flooring throughout (joist, subfloor). Insulation and finish flooring with Laminate, Vinyl Plank. |
7 |
7 |
04/17/2024 |
2022 Spring |
1070 - Msi |
Oktaha |
0 |
WO - Muck Out |
|
|
04/27/2023 |
2022 Spring |
1067 - Jne |
Muskogee |
4 |
Repair Wall and Ceiling on Landing upstairs next to Attic Fan. Remove and Replace Ceiling in Middle Bedroom and Paint Ceiling in Upstairs Bathroom. |
4 |
2 |
08/14/2023 |
2022 Spring |
1066 - Spa |
Muskogee |
0 |
WO - Muck-out |
|
|
05/30/2023 |
2022 Spring |
1066 - Spa |
Muskogee |
2 |
Spray Shockwave in any and all areas if mold is detected. Replace Drywall if mold is detected behind Base Cabinets. Base Cabinets in Kitchen - 2 - L Units - 10-ft with 6-ft / 6-ft with 6-ft both angle units. |
4 |
2 |
02/21/2024 |
2022 Spring |
1057 - Dmc |
Muskogee |
3 |
Spray Shockwave as needed. Ceilings Repair and Paint two rooms. Remove and Replace 110 Sq. Ft. flooring. Front Porch Ceiling 220 sq. ft of area. |
5 |
5 |
04/18/2024 |
2022 Spring |
1045 - Rbr |
Muskogee |
2 |
Remove and Replace Roof over Kitchen and Den, Repair Rafters, Decking, Roof over Kitchen area and replace roof over Den with Rolled-Roofing after Rafters and Decking are repaired. Den area needs Ceiling Replaced and Walls with Drywall, mud, tape, texture and Paint. Throughout the house, Tear out flooring, inspect Joist, replace as needed, install new subfloor and Laminated flooring in all areas except Wet areas, install Vinyl Plank in those areas. |
7 |
7 |
08/14/2023 |
2022 Spring |
1043 - Hmi |
Muskogee |
0 |
WO - Tarp |
|
|
04/17/2023 |
2022 Spring |
1041 - Bwh |
Muskogee |
3 |
Bathroom Walls need to be finished. Bathroom Floor needs to be finished with Vinyl Plank and Trim from Laundry area to kitchen, dining room and Living room. 2 Interior Doors. |
2 |
2 |
02/21/2024 |
2022 Spring |
1035 - Bsa |
Stilwell |
4 |
Spray Shockwave anywhere mold or moisture is detected. Hallway and behind toilet area needs drywall repair and repair hallway ceiling and paint |
4 |
3 |
03/14/2024 |
|
|
|
|
|
|
|
|